Current Projects

20201222_142338.jpg

Northfield Township WWTP Wet Weather Storage Tank

Whitmore Lake, MI

The Improvements to the Northfield Township WWTP will consist of the replacement of raw sewage pumps with associated electrical work at the 8-Mile pump station,
construction of a 1.5 MG wet weather storage tank at the WWTP site, along with a valve and meter vault, a
PEW pumping system, associated electrical and instrumentation work, yard piping and associated site improvements. 

WWTP Equalization Tank #2

Rockwood, MI

Reliance Building Company is happy to be partnered with DLZ in the design and build of the City of Rockwood's second equalization tank. The 70' diameter tank will provide valuable storage for the wastewater treatment plant in case of a high-flow event.

20210414_124148.jpg
drone 3.jpg

Walled Lake - Novi WWTP

Clarifier Renovations

Novi, MI

Reliance Building Company is performing an overhaul on two clarifiers that are part of the Oakland County Water system. The job entails the demolition and replacement of existing clarifier mechanisms and skimming equipment, along with the necessary concrete and metal repairs. RBC will also install protective coatings to help extend the clarifiers' life cycle.

Pump Station and Screening Building

Pinckney, MI

The Project consists of constructing a new 20' x 26' concrete block pump station, as well as a new 24' x 32' concrete block screening building. The pump station will receive a new 30' wet well, 8' in diameter,  as well as various upgrades to the underground sewer lines 

20201030_095946.jpg

WWTP Trickling Filter Improvements

Rockwood, MI

The Improvements to the Rockwood WWTP trickling filters include a complete overhaul of the existing system. From new coatings on the interior and exterior of the tanks, to new media and distributer arms, this project will play a crucial role in modernizing the Rockwood Waste Water Treatment Plant.

20200813_084936.jpg

Reliance is our Foundation